Pipeline by position


C
Christine Watt

Have the availability to adjust the pipeline based on the position. If an estimator and sales rep are listed on the same project- the estimator should have an "estimator" pipeline and the sales rep would have a "sales" pipeline- the job shouldn't go in everyone's sales pipeline

A